When a Different Liability Hides Behind the Price
A Hungarian importer purchased goods from an Asian manufacturer on EXW terms. The price was favourable and the deal was made quickly. EXW, however, meant that the full logistics organisation – export customs, local haulage, port administration – became the buyer's responsibility.
The company had no local agent. Administration dragged on, the container departed late, and storage charges accumulated at the port. Within a few weeks, the initial 5–7% price advantage had disappeared, and the final cost ended up higher than a FOB construction that would have seemed more expensive at the outset.
The mistake was not made by the supplier. The Incoterms term simply did not fit the importer's operational processes and competencies.
The Operating Logic: Where Does Risk Transfer?
The essence of Incoterms 2020 rules is that they unambiguously define:
- who pays for transport,
- who handles customs clearance,
- where risk transfers,
- who is responsible for insurance.
A wrong decision becomes expensive when the company does not precisely understand this risk transfer point.
For example, under FOB, the ocean freight and insurance already fall to the buyer. If the insurance coverage is insufficient, a marine loss event will not be fully covered by compensation. The loss remains with the buyer.
Under DDP, the seller is responsible for paying customs duties and import-related taxes. In practice, however, this only works smoothly if the seller has the tax registration and customs procedure authorisation required in the destination country. Without these, liability boundaries quickly blur and a dispute can arise.
Real Costs in Numbers
A mid-sized company imported machine parts on DAP terms. The shipment arrived in order, but a technical certificate was missing for customs clearance. Obtaining the document took two weeks.
Consequences:
- port storage fees,
- production line downtime,
- emergency air shipment from another supplier.
The total additional cost exceeded 12% of the shipment value. The contract had not clearly specified who was responsible for ensuring complete documentation.
In another case, DDP appeared to be a safe solution. However, the seller did not have the appropriate local tax registration, so the customs clearance stalled. Due to the delay, the buyer paid a contractual penalty to their own client. This subsequently led to a serious dispute between the buyer and the supplier.
Incoterms is not a legal formality. It is an operational and financial decision.
The Most Common Mistakes
- Choosing a lower price without examining the liability structure.
- Insufficient insurance coverage.
- Misinterpreting responsibility for export or import customs procedures.
- Ignoring the Total Landed Cost.
Most mistakes arise because Incoterms selection is treated as an administrative rather than a strategic question.
What Should the Decision-Maker Examine?
Before selecting an Incoterms term, it is worth clarifying:
- Do we have adequate logistics capacity?
- Can we handle customs procedures in the given country?
- Is there adequate insurance coverage for the transaction?
- Does the construction fit the cash flow plan?
- What would a two-week delay cost?
An Incoterms decision is, in reality, a risk allocation decision.
Summary
A poorly chosen Incoterms term can easily result in 5–15% additional cost on a transaction, and may carry even greater operational risk beyond that. In competitive international trade, the question is not which term is "cheaper" but which one fits the company's logistics, financial, and organisational capabilities.
Key Questions
Which Incoterms term is the safest? There is no universal answer. Safety depends on the company's operational capabilities.
How much additional cost can a wrong choice cause? In both direct and indirect terms, it can reach 5–15% of the transaction value.
Why is calculating Total Landed Cost important? Because only then can different constructions be compared on a genuinely equal basis.